Skip to main content

Topping off Ceremony Beam Signing

LEMA Construction celebrated with a beam signing ceremony for the Design-Build of the St. Petersburg College/Gibbs Campus NEW Student Success Center named in memory of Mr. “Joe” Lang, a longtime supporter of SPC students. The Joseph H. Lang Sr. Student Success Center will be the hub for students to receive services and support helping them move forward.

As we move into November, we thought it would be a good chance to give you a glimpse of the construction that has taken place since the beam signing celebration in August, enjoy!

 

SPC Gibbs Campus Onsite 03Aerial View Gibbs Campus 01SPC Gibss Campus Onsite 02Aerial View of Gibbs Campus 03

Leave a Reply