Advent Health Cath Lab Renovations

Complete de-install GE Mavic operating equipment and cut new floor trench for wire and cable raceways which were later covered by finish grade stainless steel plates. New welded sheet goods with top caps, a new ceiling grid system incorporating clean room tiles, and upgrading the electrical outlets. We installed a new surface-mounted wall duct for GE to run the new equipment cables and wires and uplift bracing for a sprinkler system.

ICRA ImageMaintained ICRA plan with Edge Guard panels and negative air monitoring. GE then installed new Mavic 2 equipment along with all new paint throughout the space. AHCA regulated project.ICRA Image

Architect: CDG Architecture, PA